Accueil | Our references > Paint drying

To increase production speed
To save energy
To handle a range of heavier parts
To reduce the amount of floor space taken up by drying equipment
To work in complete safety despite solvents in the atmosphere
A mixed gas/hot air infrared tunnel
Boosting your existing infrared tunnel with upstream solvent-removing
Boosting through the integration of our emitters into your existing structure
| Examples of work carried out on our customers’ premises |
|---|
| Aeronautical paint on engine nacelles dried in 30 mins |
| Varnish on converters dried in 20 mins |
| Truck chassis dried in 19 mins |
| Hydro paint on automobile plastic parts dried in 3 mins |